Welcolme to the City of Tampa East-West Road Web Site

Project Description


The City of Tampa, in cooperation with the Federal Highway Administration (FHWA) and the Florida Department of Transportation, (FDOT) is conducting a Project Development & Environment (PD&E) Study.  The Study’s purpose is to establish the conceptual location and design concepts for a proposed East-West road between I-275 and C.R. 581 (Bruce B. Downs Blvd.).  The PD&E project study area is bounded by I-275 on the west, C.R. 581 on the east, the Tampa Electric Company (TECO) easement on the south, and the Hillsborough/Pasco County line on the north.  A corridor analysis was conducted to evaluate three (3) alternative corridors in addition to the No-Build Alternative. Based on the results of the corridor analysis phase of the PD&E study, Corridor B was recommended by the City's consultant for further detailed analysis and conceptual design development. To review the Final Corridor Analysis Report click here. The “No-Build” Alternative will be a viable alternative throughout the study process.

The PD&E Study is managed by the City of Tampa.  It includes the evaluation of  a multi-lane divided typical section for the proposed East-West road within the study area.  Also, as part of the City’s PD&E Study efforts, an Interchange Justification Report (IJR) is being be prepared for a new interchange on I-275 between the existing Bearss Avenue and S.R. 54 interchanges.

Many documents require Adobe Acrobat to be viewed correctly.  Click on the icon below to install.

 

Contact Us


Copyright ã 2002  City of Tampa
For problems or questions regarding this web page, contact the webmaster.  
This site was last updated on September 03, 2002
.